S/4HANA Extended Production Engineering and Operations (PEO) Part 2 – Basic End to End Flow

MAN Production Planning (PP), MM (Materials Management), PLM Project System (PS)

Introduction This blog continuation to previous one – S/4HANA Extended Production Engineering and Operations (PEO) Part 1 – Configuration Settings Production engineering strives to bridge the gap between manufacturing and design engineering by providing seamless process flow and a more detailed process plan definition. Also Read: SAP PP Certification Preparation Guide Production Engineering and Operations […]

Continue reading


S/4HANA Extended Production Engineering and Operations (PEO) Part 1 – Configuration Settings

MAN Production Planning (PP), MM (Materials Management), PLM Project System (PS)

Production Engineering and Operations module delivered to an extension of standard Production Planning to cover the Engineering and Shop Floor Operations during the shop floor execution. SAP was not delivered the best practices to understand and implement this module in the market, so this blog covers the basic configuration required to execute end to end […]

Continue reading


A few tips and tricks on SAP Transport Requests

MM (Materials Management), PLM Project System (PS)

Problem Statement During implementation of SAP S4 HANA or ECC, it is common to transport customizing (aka configuration) and development objects from Development instance through Production. Read More: SAP MM Certification Preparation Guide It is required for functional and technical analysts to perform some transport related functions and know details about Transport Requests (TR) & […]

Continue reading


Variant Configuration ( VC ) In Assembly Processing of Network / Project

PLM Project System (PS), PLM Variant Configuration

This Blog will cover how Variant Configuration will integrate with Assembly Processing of Network/Project with necessary steps. Business Requirement: One Material has different Characteristics to Sell and depend upon the characteristics of Material; Operative Network Activity Should be selected. The created Operative Network Creation will help for evaluation purpose by Scheduling, cost, Milestone etc. Assignment […]

Continue reading


Variant Configuration (VC) In Assembly Processing of Network / Project

PLM Project System (PS)

This Blog will cover how Variant Configuration will integrate with Assembly Processing of Network/Project with necessary steps. Business Requirement: One Material has different Characteristics to Sell and depend upon the characteristics of Material; Operative Network Activity Should be selected. The created Operative Network Creation will help for evaluation purpose by Scheduling, cost, Milestone etc. Assignment […]

Continue reading


SAP S/4HANA Project Systems: Overview on the important Apps

PLM Project System (PS), SAP Fiori, SAP S/4HANA

Introduction This blog post given an overview on the important Apps available in SAP Project Systems. User Role – Project Manager / Project Planner Every project has critical elements like Project definition, WBS (Work Breakdown Structure) Elements, Activities (internally or externally executed), Milestones and material components (stockables or non-stockables) which are monitored regularly by the […]

Continue reading


Purchase Requisitions from Project Systems Material Components: BOM Explosion

PLM Project System (PS), SAP ERP

Introduction Purchase requisitions generated by material components assigned to network activities in PS carries a big limitation in a certain condition. If a requisition belongs to a material that is subcontracted (i.e. special procurement type 30) and has a Bill of Material (BOM) then this BOM is not exploded at the time of purchase requisition […]

Continue reading


Customer Enhancement Field for WBS : Creation,Field Mapping and Validation & Substitution

PLM Project System (PS)

This post will help to PS Functional as well as Technical Consultant. As per my practical experience; I found that there are number of blogs for the creation of customer field in WBS, Mapping of same as well as Validation and Substitutions, but couldn’t find all the relevant steps for integrating this whole scenario. So, […]

Continue reading